National Livestock Feed Resources Referral System

What India's livestock can be fed, and what it needs to be fed

Feed available from the crop and by-product stream, against the requirement of the livestock population — for every state and year, in Million Tonnes.

Prediction vs Requirement →
Surplus and deficit across India hover a state for its value; click to open its full comparison
Requirement uses the full-herd scenario (Total (100% Productive + 100% Non-productive)) across all crops. Other scenarios and a crop filter live on the comparison page. Availability is measured up to 2025 and projected from 2026 onward.
Dry matter available
717.36
Million Tonnes
Dry matter required
650.32
full herd · Million Tonnes
Balance (DM)
+67.04
Surplus · Million Tonnes
Requirement covered
110%
of the DM requirement met by availability

All Over India, 2026 (a projected year). These four figures do not follow the map controls — change the year above and the map recolours; open the comparison page for figures that follow every filter.

Where to go

About

What the two estimates are, where the numbers come from, and how to read Dry Fodder, Green Fodder, Concentrate, DM, CP, DCP and TDN.

Read the methodology →

Prediction vs Requirement

Both sides on one page, paired panel by panel: fresh basis and nutrient basis, availability beside requirement on a shared axis, then the tables, the rings and the balance.

Open the comparison →

Feed Availability Prediction

How much feed the crop and by-product stream makes available. Map first, then charts, pie splits, composition and the trend across every year.

Open prediction →

Feed Requirement

How much feed the livestock population needs under a chosen productivity scenario, with the balance against availability.

Open requirement →

DF / GF / Concentrate Detail

Which crops make up each feed class — paddy, wheat, maize, sugarcane and the rest — with every crop’s share of that class by tonnage and by DM, CP and TDN.

Open crop detail →
States / UTs
37
Crops & land classes
33
Availability years
2000–2047
Requirement years
1997–2044